Completed Church Building Project
![Pugwash Seventh-day Adventist Church](/build/image/79.png?or=360&crop=%2C%2C%2C&w=480&h=480&s=8b4e6009799f89d51af5a6e9699bc65c)
This is what the church looked like before the church building project began.
![](/build/image/82.jpg?or=360&crop=%2C%2C%2C&w=480&h=480&s=df318dcfe1d30251933a32fc1a71f18e)
Aug. 4, 2014 – Volunteers remove roof above entrance to old church building.
![](http://pugwash22.adventistchurchconnect.org/site/1/images/IMG3709-Building2WP.jpg)
Aug. 2014 - Footings complete and forms set in place for foundation walls.
![](http://pugwash22.adventistchurchconnect.org/site/1/images/DSCN0451-Building3WP.jpg)
Sept. 2014 – Foundation walls completed, and gravel backfill being compacted.
![](http://pugwash22.adventistchurchconnect.org/site/1/images/DSCN0549-Building6WP.jpg)
Nov. 2014 – Contractor installs roof sheathing on back of new building.
![](http://pugwash22.adventistchurchconnect.org/site/1/images/DSCN0508-Building7WP.jpg)
Nov. 2014 – Contractor builds roof above large windows in sanctuary.
![](http://pugwash22.adventistchurchconnect.org/site/1/images/DSCN0500-Building8WP.jpg)
Nov. 2014 – View from Gulf Shore Rd after most of sheathing is installed.
![](http://pugwash22.adventistchurchconnect.org/site/1/images/DSCN0492-Building9WP.jpg)
Nov. 2014 – View of inside of church after trusses have been installed.
![](http://pugwash22.adventistchurchconnect.org/site/1/images/DSCN0572-Building10WP.jpg)
Dec. 2014 – Contractor installs ice and water shield, and architectural shingles.
![](http://pugwash22.adventistchurchconnect.org/site/1/images/DSCN0743-Building11WP.jpg)
Dec. 2014 – Pastor Dave Hamilton & family in front of sanctuary windows.
![](http://pugwash22.adventistchurchconnect.org/site/1/images/DSCN0619-Building12WP.jpg)
Dec. 2014 – Volunteers install house wrap, strapping, soffit and facia.
![](http://pugwash22.adventistchurchconnect.org/site/1/images/DSCN0813-Building13WP.jpg)
Dec. 2014 – Contractor installs Cape Cod wood siding on front of church.
![](http://pugwash22.adventistchurchconnect.org/site/1/images/DSCN0807-Building14WP.jpg)
Jan. 2015 – View of lobby after installing insulation and vapour barrier.
![](http://pugwash22.adventistchurchconnect.org/site/1/images/DSCN9909-Building15WP.jpg)
Jan. 2015 – Contractor installs sound barrier and drywall around mother’s room.
![](http://pugwash22.adventistchurchconnect.org/site/1/images/DSCN9919-Building16WP.jpg)
Jan. 2015 – View of back of sanctuary after drywall was installed.
![](http://pugwash22.adventistchurchconnect.org/site/1/images/DSCN9928-Building17WP.jpg)
Jan. 2015 – View of front of sanctuary after drywall was installed.
![](http://pugwash22.adventistchurchconnect.org/site/1/images/DSCN9950-Building18WP2.jpg)
Jan. 2015 – View from Gulf Shore Rd after Cape Cod wood siding was installed.